If the actual information at the lifting site does not tally with the lifting plan, you should stop the operation until the plan has been updated and re-approved.You should never deviate or vary from the approved lifting plan.Sketch of the lifting zone (showing position of lifting equipment, crew and load) and.Requirements to erect or dismantle lifting equipment (if any).Lifting crew (including their roles and competencies).The following items must be checked and confirmed before selecting rigging components: Weight of lift Center of Gravity Lift points Crane capacity Speed, height, width, and. Your lifting plan should include, but not limited to, the following elements: including slings, shackles, turnbuckles, and the crane itself, must be selected, inspected, and connected correctly prior to beginning the lift itself. load capacity chart, range diagram, rigging method)įor complex lifts, additional engineering design efforts are necessary to ensure that the lifting operation is conducted safely. Safe work procedure or method statement.Lifting plan supported by a risk assessment (RA).For example, a lifting plan would ensure that the crane is safely deployed and operated, and the lifting crew are clear about their roles and responsibilities.īefore you start any lifting operation, you must prepare the following: A lifting plan provides a systematic approach towards planning a lift and ensures that the lifting operation is properly managed.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |